Thursday, November 13, 2008

13 nov 08

my id called me today to ask me to be present the whole day tomorrow to supervise the work to make sure it's to my liking. i was like 'the whole day?'
which made him go on about how i had 'so many thing to add on to the defect list'. he refused to listen to me when i said that alot of the additions were due to his workers doing bad patch ups, and went on a tirade of how he's tried but we're hard to please & that he's very busy & got other things to do, not only my hse.

i raised my voice at him to tell him to let me speak (coz i couldn't get a word in sideways with him going on about how he doesnt want to listen to what went wrong) & he just raised it back at me even louder! i couldn't take it anymore, and honestly, for one of the few times in my life (and i can count on one hand how many times that's happened), i just exploded & started shouting at him that he was being extremely rude to me and that he should not be shouting at me and not allowing me to speak at all.

almost everyone i know have NEVER heard me shout. (you know right gals?) that's how angry i was loh!

so yeah. we pretty much had a shouting match for a while. (during which i told him i'd go down to his office to complain to his boss at his office about his bad attitude, and that he's made this renovation experience an unhappy one for me. and that i have NEVER had anyone shouting at me like that.)

anyways, to cut a long story short, he finally 'sort of' extended an olive branch by reprasing what he said last ('i dont mean that i want you to do my job, but i just think that if you are there than the defects can be corrected there & you wont have any more defects after that') - which i actually doubt btw being that i have heard of TONS of stories where after some time of living at a place, you find out that certain things are not working well/ plastering falls off, etc.

he also 'explained away' his shouting by saying he was 'outside' (unconfirmed, but will dubiously take that as true), and that he talks to contractors most of the time so he might raise his voice unconsiously. (might be true, but if he's as experienced an ID as he claims he is, he'd know that raising his voice BACK at a client for whatever reason is a no no.)

anyways, i have agreed to take off work & go down to my house for the whole of tomorrow to oversee the workers.

but really, i still don't understand what's so difficult.

i compiled a 5 pg list of defects (& where in each room to find them) for him & informed him promptly on only 2 or 3 other seperate occasions on additions to the defect list. (between which almost no work was done anyway!) i even tagged each defect in each room with masking tape & written instruction on the tape so it's OBVIOUS to him to know where each defect is. but i'm still accused of being unreasonable and adding to the defect list (what am i to do if i see more defects? just keep my mouth shut & live with it?!?).

honest to god i had not been so angry in a LONG LONG LONG TIME.

tha dear- do you have an idea of what can be done for this? pfft. really must make sure that i don't get bullied on this. can't stand mike's unreasonableness!!

i REALLY can't wait for this reno to be over.

Monday, November 10, 2008

Angry Day

if there's anything i've learnt from this reno episode, it's this: KEEP A DAMNED GOOD EYE ON EVERY BIT OF THEIR WORKS, AND DON'T PAY THEM TILL THEY'VE COMPLETED EVERYTHING TO YOUR SATISFACTION!!!

the workmanship we got was VERY SHODDY. so shoddy that i had a 5 PAGE DEFECT LIST that my ID is going through. The worst part is that the ID feels affronted when we put additions to the defect list & told us that the reno will not be done on time if the defect list keeps expanding!!

Here are a list of my grouses with them (ane believe me-there are MORE)

1) Our reno is already more than 3 wks late. We've were promised 6 wks, and we are currently on our 10th wk. And it's always the same thing- 'by next sat, by next sat'. I don't care WHEN it's done, I just want you to have the INTEGRITY TO DO IT WHEN YOU SAY IT WILL BE DONE!!


2) There was so much bad work that we had a 5 page defect list in our home! The ID we had actually insinuated that we were being demanding in having a 5 page defect list. (We typed out all the defects & tagged them with tape all around our hse). But come on, if there weren't so many cracked tiles, holes in grouting, cracked aircon trunking, holes in electrical casing, and stained walls, would any home owner bother to be picky?!?!? FURTHERMORE, an ID is SUPPOSED to LOOK OUT for the customer, and make sure these defects DO NOT HAPPEN! OTHERWISE WHY WOULD I WANT TO GET AN ID?!?!?!? I WOULD JUST GET A CONTRACTER SO THAT I CAN SAVE THE MONEY AND HAVE A SIMILAR AMOUNT OF HEADACHE RIGHT!??!?!?

3) I got an ANGRY call from my neighbour downstairs because apparantly the workers who clean the house just THROW DIRTY WATER OUT OF THE WINDOW- A FEW TIMES THIS MONTH!!! When my bf called the ID to tell give him an earful & tell him to make sure it doesnt happen again- he said that my bf was WRONGFULLY ACCUSING HIS WORKERS & that the water they threw out the window was CLEAN, and just quickly disconnected the line when my bf wanted to say more!!! HOW RUDE IS THAT?!?!?! AND COME OFF IT- you think i was born yesterday and think that your workers suka-suka just fill a pail of CLEAN water to THROW OUT MY WINDOW?!?!?!?!

4) Everytime we point out a defect to the ID he will say the same thing: 'if you want, i will change it for you loh'. and that is usually followed with a fake laugh. MACHAM YOU ARE DOING ME A FAVOUR?!?!? COME ON NOW- I PAID FOR IT TO BE DONE PROPERLY. IT IS NOT NORTHWEST'S FIRST DAY ON THE JOB, SO WHY ARE THERE SO MANY DEFECTS IN THE FIRST PLACE?!?! FURTHERMORE, YOU SHOULD KNOW THAT CORRECTING DEFECTS ARE SOMETHING YOU SHOULD BE DOING ANYWAY!!!!

5) The solid surface we chose for our vanity was the WRONG COLOUR- apparantly because '2007 colour different from 2008 colour', and my ID- the person who's supposed to be DEALING WITH ALL THESE, asked the solid surface supplier to call me. The solid surface supplier called me, and said they DIDN'T DO ANYTHING WRONG because it was the RIGHT COLOUR CODE THAT WAS GIVEN TO THEM, and that it shouldn't matter because the COLOUR WAS ALMOST THE SAME. Again. I WAS NOT BORN YESTERDAY and I KNOW THE DIFFERENCE BETWEEN SANDY AND **** BROWN!! After raising my voice at him, they finally decided to change the solid surface for me.

I don't know if my ID with northwest is gonna wake up his idea anytime soon but am prepared to have to be demanding to get what should be done done. am starting to do research on CASE & HDB complaints already to get to know what my options are if they give me more grief. hope you don't have the same experience that I do.

Thursday, November 6, 2008

nov 7th

i think we're finally seeing the end of the tunnel!! *hopeful*

:) the ID is working through our 5 page defect list, as well as replacing our solid surface for the vanity area.

hope things will be done-- soonish!

Thursday, October 23, 2008

Some Pics

ID has said that the reno should be done by next thurs.

We'll see.

Pics so far:

Wardrobe





Kitchen Cabinets

Tuesday, October 21, 2008

Wk 7 of renovation

bleah.

there has been no updates to this blog because our ID- NORTHWEST is causing us SOO MUCH grief.

Complaints so far
1) electical work is EXTREMELY SHODDY.
- casing on the walls have holes in them (casing cut too short & electrician can't be bothered to change)
- casing is broken at some places, but also not replaced
- casing is crooked and not flush against the edge of the walls
- wiring is just done in an extremely haphazard way! the electician put casing around half of both toilets even though all i needed was a single point going in for my lights-- so what's the point of encasing half of my toilet with wire & making it so ugly?!?!?
Extremely disapponted with the wiring work. Plus from wk 4 till now, the changes have not been rectified yet- despite repeated reminders!!!

2) Cabinets done up wrongly
So the cabinets are up, but the measurements for the kitchen cabinets were done wrongly.. so they will have to change a part of it to salvage the kitchen cabinets. sigh.

3) We wanted to change the position of one of the doors to our room, and so had to pay for a new door frame. Thing is- the new door frame was made too large for the door! so now they are gonna give us a new door. BUT Mike our ID says that when its painted, the colour might not look like our original door. ?!!?!?!?!?!?!? how can they do something like that!?!?!?!?!?!!?

4) The whole of Wk 4, there was ABSOLUTELY NOTHING happening at our home. Only after we called Mike to ask what's happening that he said 'oh, coz we are busy somewhere else...' Wow. I would've been fine if the work could be completed by wk 6, but it's clearly not happened. So what gives?

and everytime i tell mike of the problems, he says he will tell the contractors. BUT NOTHING GETS DONE!!! So the wiring is still crooked, etc.

AAARRRGGGHH!!!

Monday, September 22, 2008

wk 3 of renovation!

The tiling for our living room floor, toilets & kitchen walls are now done! We're hoping that the tiling will be fully completed by end of the week, so that the rest of the work (electicals, plastering, ect) can start!

Here are some pictures of the progress thus far:

Our new casement windows:
to replace the old, slightly rusty & stiff windows that were originally in the flat. *drool* ;)


kitchen toilet:
we chose to have three strips of 'wood' looking tiles as accents. think it turned out pretty well. we're gonna ask our ID if he'd be able to do a darker grouting between each of those tiles though, so it looks abit more natural.


its all coming together! :)

Thursday, September 11, 2008

Reno Commences!

We are into wk 2 of our reno now! Here are some pics of the work so far. keke

Week 1
Day 1 of reno: Hacking commences


Hacking done, debris cleared!


Week 2
Tiling in kitchen getting done


Tiling in toilet getting done

Saturday, August 30, 2008

Where to look for toilet & kitchen related stuff:

toilet & kitchen related fixtures:
pls note that i'm only comparing jambans because in my mind, taps & shower stuff are pretty similar. a good practice i think is to always take a note pad along with you to keep track of the models that you like, as well as the prices each place sells them for.

1) royal fanco (135 Jln Besar. Tel:62990453)
good to go to get initial first quotes as the prices tt are quoted from the uncle (henry) there are pretty reasonable- so you at least know what the 'going rates' are. the uncle there is also pretty knowledgable.

2) Poh Joo (159 Jln Besar, but they have many branches!)
prices for the water closets there were pretty competitive, & the director there (benjamin) is pretty experienced & helpful. definitely good to check out.

3) Hoe Kee (8 Genting Road)
it's also recommended due to variety i think. again, i have not personally checked it out, but have heard it's good.

4)Chuan Heng Hardware (144 Jalan Besar)
prices quoted from his were reasonable too. the dude we spoke to seemed pretty knowledgable. good to check out. :)

5) Sim Siang Choon (551 Balestier Rd)
i had visited this place briefly, but had not compared prices. it does come recommended though.

6) about the jamban
from what i've heard, these are the usual 'brands' to look out for: toto, rigel, genova, american standard, baron, velin, crizto.
also- look through the papers for warehouse sales, as you can get pretty good deals then.

Friday, August 29, 2008

let there be light (part 1)

after extensive light hunting over the past few weekends, we finally decided on our lights!

the bf's friend recommended lights arcade (321 balestier rd), saying that they had very reasonably priced lights, and that if we had any lights in mind that were not on display, we could get them to check if they could get it for us & do a 'package' deal with them.

the lady we met there (jen-e loh) was really friendly & went around recommending lights that to us when we told her the type of look & feel that we wanted. her opinions were really helpful. definitely will visit their shop again if i ever need to change lights next time. and yes. i'd recommend them too. but of course with the disclaimer tt it's always wise to 'shop around' first so you know what the prices are like la.

the total quote that she came up with was reasonable- we actually meant to just go there to get a quote, but the fact that she chased me down to return my handphone which i accidentally left at their store was probably the clincher. lol. we ended up paying the deposit (only $50) to them & the rest was history. hehe.

bedroom entrance downlight (halogen light, movable. $20)


study room light (rectangular with wooden border & glass top $90 for double tube)
we got recommended this as the jen said that the tubes would be significantly brighter for the study. other than the shape & tubes used, it looks the same as the rest of the rooms!


bedroom lights (square with wooden border. $65 each)
we actually wanted a simpler looking one with just a plain brown border tt was going for $90 in other shops... but was told that the one we wanted would be a hassle as the bulb changing is difficult due to the structure. oh well. this was just as good. save $$ s'more. :)


toilet lights- mini 'hamburgers' (fibre glass acrylic $30 each)
we wanted to get the cheaper normal versions, but were told that these would not turn yellow for loooooong loooong time. so ok la. hope it means i will be better able to squeeze those tiny tiny zits easily coz i can see them so well in the white light for a loooong loooong time!

let there be light (part 2)

downlights for hall (13 by 13 cm. $25 each)


corner living room light (the birdsnest. $70)
yes i know it's gonna be difficult to clean... but i likey. hehe


dining room light (dark brown string lamp trio $165)
originally wanted a more 'woody' type light, but was told by the owner that they no longer brought it in coz they had problems with the workmanship. so we settled with this one.


kitchen lights (big 'hamburger- fiberglass acrylic $48)
also decided to 'upgrade' this due to the 'stay white' reason. well. hopefully i'll be able to spot & baygon all would-be pests easily for looong looong time with this.


post discount, we ended up with a grand total of $865 spent, as well as a written & signed disclaimer from the boss of lights arcade that read like so on our invoice:
'any lights not suitable can be exchanged or rejected (before mounting) without any penalty or surcharge'

he also assured us that if for any reason we need to replace the light parts in the future, his company will die die try to find a replacement for us. lights that he provide will also come with a 6 month warranty, after which if there is a problem with the lights, he will still change for us if anything wrong within 1-2 yrs. sounds good la.

Wednesday, August 20, 2008

home choices- mbr toilet

showerhead set ('upgraded' for $125):


shower mixer ('upgraded' for $90 i think):


toilet basin mixer:


mbr toilet basin:


mbr wc:
still to be confirmed. :p i didn't really like the rest of the choices of wc at lucky khoon.. so am thinking of buying this seperately on my own..

home choices: kitchen

now for the kitchen stuff:

kitchen hood:


kitchen hob:


kitchen mixer (we 'upgraded this one'.. dunno what the damage is yet):


kitchen sink:

home choices- kitchen toilet

went to lucky khoon (31 Joo Chiat Place) to pick our home 'accessories' that came with the northwest package. btw- don't ask me what brand cuz i didn't really take note. think cuz it's provided by the ID firm, should not be too 'good' brand also la.

kitchen toilet showerhead:


kitchen toilet shower mixer:


kitchen toilet basin mixer:


kitchen toilet basin:


kitchen toilet wc:

furniture we bought!

hehe just an update on the furniture we have so far:

bedframe:


shoe cabinet:


sofa:


1-seater:

Wednesday, August 13, 2008

Very packed weekend!

We went to meet Mike (our UD) to show him our home & let him take measurements as well as choose the tiles for our home on the weekend. Oh. We also decided on a few changes to our room layout

1) Change of Layout:
Our initial layout was to knock down a portion of wall between the MBR & the bedroom like so:


However, we realised once we went to 'view' our flat on our own, that we get very good wind flow from the living room area windows... so we decided to maximise the ventilation, by changing our layout to this:


Mike has said that he will get back to us on what the additional costs might be... so we're keeping our fingers firmly crosed. We have both hacking & sealing of areas to deal with on our original & recent design, so hopefully the damage will not be substantial *crosses toes too*


2) Mike views flat
First thing when we went to our home: Mike pointed out a long crack along the side of the wall. Suggested that we give HDB a call to make sure that there was nothing structurally wrong with the room. Felt very concerned when I heard that. He also did some measurements on the vanity area we wanted outside our MBR, as well as confirmed the length of the cabinetry we wanted done. exciting!


3) Viewing of tiles at Hafary
Me and the bf were a little ks. Mike told us that the tile shop that Northwest has a business relationship mainly with Hafary, so we'd probably be picking our tiles from there. So we happily made our way down early last week to 'see see look look' took a few samples of what we thought we wanted. I had a friend also doing renovations presently who went to 2 other tile shops, so I bummed the samples which he didn't want off him & we picked the samples from there too. keke. So once we went to Hafary, we simply took out our tile sample choices & showed them to Mike. It was then pretty much a 'look for matching tile' game there at Hafary. We did however change our 'simple white walls' idea for our kitchen toilet & went for tiles which looked slightly 'woody'. I wish wish wish that I took pictures of the samples, but I didn't... will update once I do get the samples from Mike next time we meet him! (He very kindly offered to pick up samples of our tile choices!)

Monday, August 4, 2008

Pictures!

Bedroom 3


Bedroom 2


MBR Toilet


Master Bedroom


Kitchen Toilet


Kitchen


Living Room

Tuesday, July 29, 2008

2nd appointment confirmed!

hdb really is quite efficient these days- we received a notification via sms that our 2nd appointment date has been confirmed!

d-day: 08.08.08

hahahaha. in the words of all the aunty-uncles out there: HUAT AH!!!

we'll be liasing with the owner's agent to do a final inspection of the flat before the appointment. (as per hdb instruction)

note to self: bring a camera so you can get trigger happy!

whohooo!! this is so exciting!!

Tuesday, July 22, 2008

home layout

here's our home layout! :) a 4rm in serangoon central!

Monday, July 21, 2008

Reviews: IDs

hehe. oops. sorry for the long lapse. have been realy busy with work, our 1st appt, id reviewing and various other market research. keke

but firstly, let me share on the various IDs that we've spoken to so far:


Plush Design: 4/5, $$$$
Spoke to Sky from Plush. He's the boss there I think. He's one that really gives alot of confidence that the work he turns out will be good. First thing he did was to show us the carpentry that his workshop turns out, and he really emphasizes on quality. He's really professional too- provided us with a work file, with quote, drawings, etc, and shows all costs clearly (ie: no unseen costs). Design wise also not bad- practical layouts which we agreed with. We definitely liked him, but unfortunately, his price range was on the higher side, so we decided to drop after a while. Would def. recommend him for pple with bigger budgets though.

Inzen: 3.4/5 $$$$
Had heard alot about their pricing being very reasonable, so decided to try them out too. However their price range is only slightly lower than that of Plush Design. Design wise also ok la. Nothing too earth shattering cuz we already knew what we want. ID I spoke to (Roy) there was not too bad though. Seems pretty experienced. Good to 'check out' I think.

Love Home: 1.5/5
Was walking around the toa payoh area and chanced upon their showroom. Spoke to Samuel who said he was one of the directors there. Went to meet him a 2nd time with our floorplan as we didn't bring it the 1st time round. Wah. Service damn bad. Supposed to meet him in the morning at 10am. We turned up, but he didn't. Called him repeatedly, but no ans. Only in the late afternoon did we get an sms from him that he overslept. Didn't even bother to call. Wah. Nevermind, we set another appt with him. And he was late again. We were quite put off by the lack of professionalism. Although he apologised, I the damage was already done. He also didn't bother to contact us again for a follow up discussion & to give us a quote.

Ideal House: 1/5 $$$$$
Heard about Ideal House from renotalk. decided to check it out since we were nearby. Experience was not ideal la. An ID named Alton served us. He smelt of stale smoke, and pushed us the package & asked us if we wanted to sign on that day itself. Put off coz I don't think it's right for IDs to hardsell their services without showing what they can deliver 1st. Gave him the floorplan & budget. When we met him for follow up, the budget was busted by about 30%. Very pricy, with significantly 'contractor' feel. Not impressed.

Wea Design: 4/5 $$$
Along the same stretch as Love Home. Their pricing is extremely competitive, with very good package deals. They throw in ALOT of stuff: system 3 aircon, cooker hood & hob, kitchen sink & mixer, 2 toilet bowls, toilet sinks & mixers, shower, accessories & instant heaters. However, you have no choice as to the type of freebies you get. No 'upgrading'. They will reimburse you whatever you don't want from them. Their workmanship is also not bad, though I suspect you'll have to be a little anal with them, as they have a 'contractor' feel to them as well. ID was Apple. She seemed very sincere, but not too experienced. Had to check about the pricing of alot of items. Also, somehow their co name is not listed under the approved list of contractors! Spoke to Apple about it & she said that they're under a parent co that IS under the approved list. We decided to drop coz not comfortable with that, and coz we met another ID which we felt would be better.

Northwest Interior Design: 4/5 $$$
Went to Northwest coz they had some promo in the newspapers. Decided to check them out. Met with an ID called Mike. Quite a good impression of him. He could draw out mockups of what we wanted various cabinetry/layouts to look like off the bat. Seems quite experienced & could tell us based on our works what the estimated costs would go to based on his experience. Took us to a showflat his colleague was doing up to look at the carpentry. Not bad as well. The co also gives ALOT of freebies with their resale package, which look quite good: system 3 aircon, kitchen hob, hood, sink, mixer, 2 sets of toilet bowls, sink & taps, bath mixers, toilet accessories & a storage heater. You have a choice of a small range of each item & can even change/top up for more expensive items at their supplier's shop should you want to. Decided to go with them coz the price was reasonable and we have faith (hopefully not misplaced!) that the ID will be a good project manager. Will def. be taking lots of pics of the reno in progress!

Saturday, July 12, 2008

deferment granted!

whoohooo!

we're allowed to get married next year in mar 09!

thank you the powers that be in HDB!!!